Raw Data
Raw Data
En raison des travaux, les lignes 1, 2 et M sont déviées et des arrêts sont perturbés.
Cause: Construction
(10)Effect: Stop Moved
(9)Start: 2026-08-23T22:01:00.000Z -> End: 2199-12-31T23:00:00.000Z
Trips (0):
The "breadcrumbs" element is always present, on top of the page.
It shows you where you are on the lab.
It enables you to reach any page on the lab.
GtfsStop: gs:tec:H4mo163aparentStation: tec:s-mouscronmoeskroenplacedepicardiepicardiepleinplatformCode: locationType: Stop/platform (0)description: Rue de Tourcoing - Rue du ValwheelchairBoarding: 1 There exists some accessible path from outside the station to the specific stop/platform.
GtfsAgency: tecLocation: 3.212554,50.743762routeTypes: 3| Id | Name | Platform | type | Lat | Lon |
|---|---|---|---|---|---|
| gs:tec:H4mo163a | MOUSCRON/MOESKROEN Place de Picardie/Picardieplein | Stop/platform (0) | 50.743762 | 3.212554 | |
| tec:s-mouscronmoeskroenplacedepicardiepicardieplein | MOUSCRON/MOESKROEN Place de Picardie/Picardieplein | Station (1) | 50.743762 | 3.212554 |
En raison des travaux, les lignes 1, 2 et M sont déviées et des arrêts sont perturbés.
(10)(9)